The 5B Maverick blocks are pre-assembled and pre-wired at a factory, then packed vertically so that four blocks can be fitted into a standard 40 foot shipping container with a total weight of under the maximum 6 tonne payload. Once onsite 5B Mavericks blocks can be easily unloaded and expanded into a ground-mount East. 5B is already shipping internationally. In fact, its record-setting deployment in May was done in Chile. The company has already deployed the Maverick solution at numerous sites, with a total generation capacity over 60 MW, and.