Power station 1 was commissioned in 1942 and had a capacity of 21MW, but was decommissioned in 1970. Station 2 had an initial capacity of 75MW when it was commissioned in 1955, but it was de-rated to 20MW due to uneconomical units. With a capacity of 60MW, Power Station 3 consists of pulverized fuel-fired. Proposed in 2019: US$176 million loan from Afreximbank, but only $52 million earmarked for the re-powering project The power station would be located in, in in the eastern part of the country, close to the international border with. The power station would be at the site of the existing, approximately 37 kilometres (23 mi) by road, northwest of, the nearest large city and the provincial capital. This is about 250 kilometres (155 mi) by road, southeast of the city of, the national capital and largest city in the country. • • • • •.